115,858tCO2e, modelled total footprint
94.6%of it in Scope 3
88.5%from purchased steel alone
15Scope 3 categories screened

Profile: a typical mid-sized structural steel manufacturer in the UAE, with two plants, one warehouse and about 850 employees. Scope of work: Scope 1, 2 and 3 inventory, hotspot analysis, decarbonisation roadmap, climate risk screening and a GRI and IFRS S1/S2 informed reporting structure.

The situation

Customers are asking, and the data is scattered

A customer’s supplier questionnaire arrives with a new section: report your Scope 1, 2 and 3 emissions before the contract is renewed. A typical manufacturer in this position has already done real sustainability work, such as an LED retrofit, a rooftop solar pilot or scrap recycling. What it does not have is a GHG inventory.

Fuel records sit with the logistics team. Electricity bills are held site by site. Procurement tracks spend, not tonnes or carbon. Suppliers have not shared product-level emissions data. Each of these is common, and together they make a credible answer hard to give.

The challenge

Five gaps most manufacturers recognise

Fragmented energy and fuel recordsHeld across sites and departments, in different formats.
Incomplete procurement dataCost recorded, but not material grade, origin or tonnage.
Limited supplier-specific dataProxy factors are needed until suppliers share product footprints.
No established GHG inventoryNo agreed boundary, baseline year or calculation method.
Rising expectationsCustomers, lenders and other stakeholders want evidence, not estimates.
The approach

Six stages from scattered records to a defensible inventory

D1 Percent could work through Discover, Assess, Measure, Analyse, Report and Improve.

  1. DiscoverUnderstand the business, facilities and existing sustainability activity, and name a data owner for each site.
  2. AssessRun a gap assessment, then agree the organisational and operational boundary and the reporting period.
  3. MeasureCollect activity data, select emission factors from named sources, and calculate emissions in line with the GHG Protocol Corporate Standard and Scope 3 Standard.
  4. AnalyseIdentify hotspots, intensity metrics and data-quality gaps.
  5. ReportOrganise results under GRI and IFRS S1/S2 informed headings.
  6. ImproveDevelop a decarbonisation roadmap, a climate risk screening and KPIs for the next cycle.

Every figure would link to a documented activity record and a labelled emission factor. That traceability is what makes an inventory defensible to a customer, a lender or an auditor.

Method

How each scope could be assessed

Scope 1

Natural gas in furnaces, diesel and petrol in the fleet and generators, and refrigerant leakage. Data comes from gas bills, fuel cards and service records.

Scope 2

Purchased electricity at each site, reported on a location basis, with a market-based figure where contracts or certificates exist.

Scope 3

All 15 GHG Protocol categories screened. In the modelled example nine are calculated, led by purchased steel, capital goods, freight, employee commuting, and waste and business travel. Six are documented as not relevant, not applicable or excluded for lack of data.

What the assessment could reveal

Where the emissions would sit

Based on the modelled assumptions, the footprint comes to about 115,858 tCO2e. Scope 1 and Scope 2 are each around 2.7%. Scope 3 is 94.6%.

Scope 1 and 2 are 5.4 percent of modelled emissions; Scope 3 is 94.6 percent 5.4% 94.6% Scope 3 value chain What a site visit sees Furnaces, fleet, grid power Above the waterline Scope 1 + 2: about 6,222 tCO2e Below the waterline Purchased steel alone 88.5% of the total
Modelled distribution of emissions by scope. Figures are estimates built from assumed data.

Modelled Scope 3 emissions by category (tCO2e)

Cat 1 Purchased goods and services102,500
Cat 2 Capital goods2,700
Cat 4 Upstream transport2,120
Cat 3 Fuel and energy related1,017
Cat 7 Employee commuting541
Cat 9 Downstream transport432
Cat 5 Waste in operations284
Cat 6 Business travel35
Cat 12 End-of-life treatment7
Modelled estimate on one scale. Category 1 is 93.5% of Scope 3. Categories 8, 10, 11, 13, 14 and 15 are documented as not relevant, not applicable or excluded.
  • Purchased steel could emerge as the biggest hotspot.At 88.5% of the total, the largest lever sits in procurement, not in plant operations.
  • The delivery fleet could outweigh furnace combustion.Modelled fleet diesel is about 1,666 tCO2e against about 595 tCO2e for natural gas at both plants combined.
  • Supplier-specific data could materially improve Scope 3 accuracy.The largest line relies on a generic factor, so replacing it is the first priority.
  • Reducing diesel and electricity use is right but limited.Those sources are about 5% of the footprint. The analysis could help management focus on procurement and supply-chain action.
Fleet diesel1,666
Natural gas, both plants595

All figures in this example are modelled estimates built from assumed activity data and proxy factors. Actual results would depend on primary data, verified emission factors and the organisation’s own boundaries.

A possible roadmap

Eight initiatives, none guaranteed

Each initiative would carry an owner, a KPI, its assumptions and the feasibility work still needed before any saving is relied on.

#Potential initiativeSourceModelled estimate
1Supplier-specific product carbon footprintsScope 3, Cat 1Not quantified
2Low-carbon steel sourcingScope 3, Cat 1Not quantified
3Fleet routing and driver efficiencyScope 1, dieselAbout 167 tCO2e (10% efficiency assumption)
4On-site solar expansionScope 2Not quantified
5Refrigerant leak detectionScope 1, fugitiveAbout 94 tCO2e (leakage assumption)
6Employee commuting improvementsScope 3, Cat 7Not quantified
7Freight consolidationScope 3, Cat 4 and 9Not quantified
8Waste diversion and recyclingScope 3, Cat 5Small, on a minor source
Risk and reporting

Climate risk screening and reporting readiness

An initial screening could structure six physical and transition risks, from extreme heat and supply-chain disruption to carbon pricing on embedded emissions and loss of contracts without credible GHG data. A real assessment would add site-specific hazard data, climate scenarios, exposure analysis and financial impact assessment.

The resulting dataset could then be organised to support GRI 305 and IFRS S1/S2 informed reporting. An indicative mapping like this does not establish compliance with any standard, and assurance requires independent verification.

Why it matters

A questionnaire becomes a manageable task

A structured GHG inventory shows leadership where emissions concentrate, which actions are worth the effort, and where better data would change the answer most. For manufacturers in the UAE and wider GCC, it can also be the foundation for supplier engagement, tender responses and future disclosure requirements.

What D1 Percent could do for you

  • GHG inventory development
  • Scope 1, 2 and 3 emissions assessment
  • Emissions hotspot identification
  • Data-quality improvement
  • Decarbonisation planning
  • Climate risk screening
  • Sustainability reporting preparation

Discuss your GHG accounting and ESG reporting requirements

Whether you are starting a first inventory or preparing for customer and disclosure expectations, our team can help you scope a practical approach.

Talk to our team
FAQs

Questions manufacturers ask

What is a Scope 1, 2 and 3 emissions assessment?

It is a structured calculation of a company’s greenhouse gas emissions under the GHG Protocol. Scope 1 covers direct emissions such as fuel burned on site and in owned vehicles. Scope 2 covers purchased electricity. Scope 3 covers all other value-chain emissions, such as purchased materials, freight and employee commuting.

Why is Scope 3 usually the largest part of a manufacturer’s footprint?

Because manufacturers buy large volumes of energy-intensive materials. In the modelled steel example, purchased goods and services account for 88.5% of emissions. A real result depends on the company’s own purchasing data and the emission factors used.

What data does a manufacturer need to start a GHG inventory?

The core records are gas, fuel and electricity bills, fleet and generator fuel logs, refrigerant service records, purchase quantities by material and supplier, freight records, and headcount with commuting information. Gaps are normal. A good assessment flags them and agrees reasonable estimation rules.

What is the difference between location-based and market-based Scope 2?

Location-based uses the average emission factor of the local electricity grid. Market-based reflects the electricity a company has chosen through contracts or certificates. The GHG Protocol asks companies to report both where they have contractual instruments.

How accurate is a first GHG inventory?

A first inventory is usually accurate for Scope 1 and 2 and less certain for Scope 3, where generic factors and spend-based estimates are common. Labelling each line as primary, secondary or estimated shows readers how much confidence to place in it, and shows where supplier data would help most.

Can a GHG inventory support GRI and IFRS S2 reporting?

It can provide the data foundation. GRI 305 and IFRS S2 both ask for Scope 1, 2 and 3 emissions and related information. Compliance with either needs every disclosure requirement met in full, and assurance needs independent verification.

How long does a Scope 1, 2 and 3 assessment take?

It depends on data availability, the number of sites and how many Scope 3 categories apply. Timing is confirmed after a short gap assessment.

Does D1 Percent work with manufacturers in the UAE and GCC?

D1 Percent is an ESG and GHG advisory firm serving organisations in the UAE and wider GCC. To discuss GHG accounting or ESG reporting for your organisation, contact the team through d1percent.com.

NEWSLETTER

STAY UP TO DATE, SUBSCRIBE